HONGYANG GROUP Virgin Islands Technical Center

Fax: +86 (577)88097280

HONGYANG Group logo

HONGYANG GROUP Virgin Islands Technical Center , Discuss Technical Problem , Suply After Service Online of Fuel Dispenser, Please Regist Firstly

D-GB6Q FUEL DISPENSER

D-GB6Q

D-GB6Q FUEL DISPENSER

FlowMeter Type: Optional

Accuracy :±0.2%

Pressure Loss (kg/cm): Under 0.25

Motor Voltage(V):110V/220V/380V,50Hz/60Hz

Capacity(hp) :1HP(0.75kw)

Input Voltage :110V/220V/380V,50Hz/60Hz

Nozzle : Auto Shut-off Nozzle

Environmental Condition : -40~~+55degree

Control Type : Solenold Vale Control Type

Preset :Function Provided(Small LCDIndicator)

Display(Counter) :Type LCD and Bright Backlight

Digit of Volume : 0~~999,999(6 Digits),Decimal point can be changed

Digit of Amount : 0~~999,999(6 Digits),Decimal point can be changed

Digit of Unit price : 0~~9999(4 Digits),Decimal point can be changed

Digit of Total Range : 0~~99,999,999,99

Optional Display Type :LCD and Bright Backlight

Digit of Volume :0~~99,999,999(8 Digits),Decimal point can be changed

Digit of Amount :0~~99,999,999(8 Digits),Decimal point can be changed

Digit of Unit price :0~~999999(6 Digits),Decimal point can be changed

Digit of Total Range :0~~99,999,999,99

Totalizer:1~~9,999,999

Hose :4.5m

Weight : 385kg

Dimension(L×W×H) : 1270 x 620 x 2420(mm)

Dimension(L×W×H)Of Qty of Container: 40ft: 28 20ft: 13

products links

links

technical archives

    ’t shut. Check valve can’t open fully as amount of waste at the lower part of outlet valve of vapor separator. Upper cover gasket of vapor separator is broken, leads to pressure not enough. fuel dispenser 3.5. Pipeline is jammed and bottom valve could not fully open. Serious fluctuation and noise in operation Jammed filter net and too long or too thin pipeline cause heavy loan making big noise. fuel dispenser Locked overflow valve or too tight adjusting bolt. Jammed vane causes serious oil fluctuation Pipeline vibrates heavy. Delivery frequency is same to inherent mechanical frequency. instable flow rate as starting Overflow valve works abnormally. Pipeline has U shape curve, generating air resistance. Pipe valve has some trouble. Contain foam in flowing oil Pipe and bottom valve troub fuel dispenser le because of ceaseless exhausting air in vapor separator. Exhausting pipe inhales air. Inspect check valve and cone-shaped valve. Vapor separator’s outlet valve and exhausting valve is jammed leading to fail to separate air from oil. Accuracy beyond scope Double optical board is broken in pulse sensor, which leads to countable pulse lost. Inner leakage in measurement transducer causes accuracy beyond range. Change new transducer. As insufficient capacity of vapor separator, check outlet valve and exhausting pipe. Fuel dispenser’s main board is broken, which also lead to inaccuracy. Pipeline leakage causes vapor separator lost function. Motor rotates slowly and become hot as refueling Motor has been destroyed. Winding short circuit or disconnected; starting capacitor has been damaged in single phase motor; Control circuit of motor is broken, which leads to starting problem. Exterior wiring also cause motor failure, (absent electric phase, long wiring distance, too thin lead, much lower voltage) Oil overflowing in exhausting pipe Small floater is damaged and dropped down in vapor separator. Large amount of oil flow into vapor separating chamber; oil is discharge from exhausting pipe as return valve trouble

technical specification

    s quantified by metrology. Suitable dosemeter calibrations  the Relative Biological Efficiency (RBE) carried out in situ ( field calibrations ) can  which is defined as fuel dispenser the quotient of the ab- significantly increase the measurement accu-  sorbed dose of a reference radiation and of the racy. For this purpose first the radiation field  absorbed dose of t fuel dispenser he radiation type of inter- is characterized with regard to the energy  est both with the same observed biological distribution and the directional distribution of  effect. From this definition it follows that the particles using a spectrometer. With these  when the radiation quality is equal the RBE data reference values are then computed for  value is a function of b fuel dispenser oth the examined the dose quantities thus making calibrations  biological system and the reference radiation possible.  used.   With support from an EU project a new  There has been a close cooperation between spectrometer has been developed which is  the Forschungszentrum f r Umwelt und able to determine the energy and the direc-  Gesundheit (GSF) M nchen-Neuherberg tional distribution of the radiation field simul-  (National Research Centre for Environment taneously (see Fig. 4). This requires thorough  and Health) and the PTB for some years now measurement and computation of the re-  aiming at the creation of a broader database sponse function of this spectrometer and the  for improved risk evaluation for neutrons in further development of special methods of  the energy range from 0.04 MeV to 200 MeV data analysis ( unfolding methods ). So far  at low absorbed doses i. e. below approx. measurements have been carried out in differ-  200 mGy. For this purpose the dicentric ent workplace fields: on a light-water reac

we are committed to create the best workplace, encourage our staffs to put their own personalities into their jobs, and provide them a stage to show themselves.

    ure to encourage the private financing of public works may at last yield results. And, after a shaky start, a new model for commissioning power generation is starting to show it can attract fuel dispenser private capital to the electricity industry. Ignore or overrule But this is not enough. The central government is responsible for investment amounting to only 0.8% of GDP. Its attitude to fuel dispenser wards regulatory agencies, whose independence should encourage investment in infrastructure, has bordered on hostility. The telecoms ministry has more than once sought to overrule Anatel, the industry regulator. And investment in sanitation has been stuck at a derisory 0.2% of GDP for the past seven years, leaving a quarter of Brazil s urban population lacking access to sewerage. The reforms r fuel dispenser equired to boost Brazil s growth are as familiar as old jokes. They include formal independence for the Central Bank, which would allow it to achieve its inflation target with lower interest rates, lower trade tariffs, a simpler tax system and, above all, a long-term plan to reduce spending and the net public debt, which at present stands at about half of GDP. With taxes close to their limit (tax revenue hit a record 37% of GDP last year) and spending rising inexorably, the government will struggle to deliver the primary budget surplus (ie, before interest payments) of 4¼% of GDP that it has promised. “It s clear this model is almost exhausted,�says Marcos Mendes, an economist in Brasília, the capital. A better one would, among other things, give the government more discretion over spending, 90% of which is tied to items like pensions and health, and breaking the link between the minimum wage and pensions. All would inflict political pain. Brazilians wonder whether new models can be built with the same old politics. Mr Alckmin, a tax-cutting technocrat who has run an uninspired campaign short on detail, might just do better. But the inertia built into Brazil s institutions may get the better of any candidate. The